• 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。
  • 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。
  • 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。
  • 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。

山东省商务厅

首页
>专题专栏>山东省重点对外合作项目>English>Infrastructure
Longkou Port 4*100,000 DWT Berth Construction (No. 30-33) of Longkou Port Group Co., Ltd.
发布日期:2015-06-10 00:00 信息来源:山东省商务厅门户网站
信息来源:山东省商务厅门户网站
浏览次数: 6 字体:【

I Name of the project

Longkou Port 4*100,000 DWT Berth Construction (No. 30-33) of Longkou Port Group Co., Ltd.

II Introduction to the project unit

Longkou port, founded in 1914 and opened to the outside world in 1984, is one of the three core port areas of Yantai and one of the two 100 million ton port areas planned and constructed by Shandong Province. The port currently has 30 berths, including 7 00,000 DWT berths and one 150,000 DWT berth. The main channel is 16 meters in depth and 300 meters in bottom width. A special brand logistics chain including CA break-bulk liner, bauxite, coal, liquid chemicals, timber and containers is formed. In 2013, the annual throughput of the port broke 70 million tons, and the containers broke 0.45 million TEU. Longkou Port Group Co., Ltd. is he subject of development, construction and operation of Kongkou Port, with registered capital being 0.36 billion CNY and total assets being 7.5 billion CNY.

III Project content and scale of the construction

The project will build four 100,000 DWT (No. 30-33) berths. Length of the frontage is about 1200m, designed top elevation of the frontage is 3.6m, the designed bottom elevation of harbor basins and berths is -16m, and the bottom elevation is preserved to be -18m according to the wharf structure of 150,000 DWT. Diameter of the turning circle of the harbor basic is 560m, and the designed bottom elevation is -16m. Construction period of the project is from 2013 to 2015.

IV Construction conditions of the project

Longkou development zone is located at the northwest part of Shandong Peninsula, where the regional advantages are obvious, the economic strength is enormous, the industrial base is good, and the traffic system is complete. It is one of the seldom coastal development zones integrating harbor and natural resources such as electric power, coal, oil and natural gas. Infrastructure such as water, electricity, natural gas and roads and the supporting joint inspection organizations such as customs, commodity inspection, maritime affairs and port are complete. The new-built wharf enterprises will enjoy the preferential policy of “three exemptions and three reductions” of the state on corporate income tax.

V Total investment of the project

$ 450 million

VI Market and economic benefit analysis and forecast

The annual throughput capacity can reach to 30 million tons and the business income can reach to 0.4 billion CNY after the project is put into production.

VII Ways of cooperation

Joint venture, cooperation

VIII Contact information

Contact Address: Longkou Port Group

Contact person: Liu Hongxin

Post code: 264000

Contact number: 0086-535-8845576, 0086-13864597753

E-mail: qyfzhb@163.com

【打印本页】【关闭窗口】
山东商务网版权与免责声明:

1、凡本站及其子站注明“文章类型:原创”的所有作品,其版权属于山东国际商务网及其子站所有。其他媒体、网站或个人转载使用时必须注明:“文章来源:山东国际商务网”。
2、凡本站及其子站注明“文章类型:转载”、“文章类型:编译”、“文章类型:摘编”的所有作品,均转载、编译或摘编自其它媒体,转载、编译或摘编的目的在于传递更多信息,并不代表本站及其子站赞同其观点和对其真实性负责。其他媒体、网站或个人转载使用时必须保留本站注明的文章来源,并自负法律责任。

Produced By 大汉网络 大汉版通发布系统