- 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。
- 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。
I Name of the
project
Geothermal Exploitation Project of Juancheng County of Heze City
II Introduction
to the project unit
Underground of Juancheng county is provided with rich geothermal
resources, and area of geothermal anomaly occupies 360 square kilometers,
including 63 square kilometers of thermal potential area, where the highest
temperature can reach to 90℃. The development value of the project is
equivalent to a coal mine above medium size, and therefore its development prospect is favorable.
III Project
content and scale of the construction
Main construction content of Geothermal Exploitation Project of Juancheng
County comprises: high-tech agricultural planting, high-tech aquaculture,
recreation and health care, bathing and medical service.
IV Construction
conditions of the project
Area of geothermal anomaly in Juancheng occupies 360 square kilometers,
and the water temperature is between 65 and 90 ℃. Contents of iodine and
strontium have reached the standard. The first geothermal well has been
successfully drilled, which is called “the first well in Qilu” by national
geologists and provides foundation for construction of the project.
V Total investment
of the project
$ 50 million
VI Market and
economic benefit analysis and forecast
The average operating income in normal years is 102,266,200 CNY, the tax
expense is 5.071 million CNY, and the profit is 44.604 million CNY.
VII Ways of
cooperation
Sole proprietorship, joint venture, cooperation
VIII Contact
information
Contact address: Commerce Bureau of Heze City
Contact person: Xu Hui
Post code: 274000
Contact number: 0086-530-6226266
E-mail: 5336400@163.com
1、凡本站及其子站注明“文章类型:原创”的所有作品,其版权属于山东国际商务网及其子站所有。其他媒体、网站或个人转载使用时必须注明:“文章来源:山东国际商务网”。
2、凡本站及其子站注明“文章类型:转载”、“文章类型:编译”、“文章类型:摘编”的所有作品,均转载、编译或摘编自其它媒体,转载、编译或摘编的目的在于传递更多信息,并不代表本站及其子站赞同其观点和对其真实性负责。其他媒体、网站或个人转载使用时必须保留本站注明的文章来源,并自负法律责任。