• 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。
  • 深入开展网络安全知识技能宣传普及,提高广大人民群众网络安全意识和防护技能 网络安全为人民,网络安全靠人民。
首页
>专题专栏>山东省重点对外合作项目>English>Infrastructure
Datang Yuncheng 2×1000MW Coal-electricity Integration Project for Power Generation of Datang Shandong Power Generation Co., Ltd.
发布日期:2015-06-10 00:00 信息来源:山东省商务厅门户网站
信息来源:山东省商务厅门户网站
浏览次数: 字体:【

I Name of the project

Datang Yuncheng 2×1000MW Coal-electricity Integration Project for Power Generation of Datang Shandong Power Generation Co., Ltd.

II Introduction to the project unit

Datang Shandong Power Generation Co., Ltd., founded in January 2009, is a state-owned exclusive company founded by China Datang Corporation with registered capital being 3 billion CNY. Main business scope of the company comprises: production and sales management of electric power and heating power; maintenance, debugging, operation maintenance, manufacturing and selling of electrical equipment; research and test of electrical power engineering and techniques; development and technology promotion service of new energy; leasing industry; enterprise management and consultation service; investment construction and investment management; supply of electrical power materials; application and development service of computers. The company currently has 2788 employees.

III Project content and scale of the construction

The large-scale coal-electricity integration power generation project is invested and constructed by Datang Shandong Power Generation Co., Ltd.. Planned engineering capacity is 4×1000MW ultra-supercritical coal-fired unit. The project will be constructed in several phases. In this phase, the 2×1000MW ultra-supercritical coal-fired unit will be constructed as well as the flue gas desulfurization and denitration device, and the space for extension has been left. In this project, the 2× 1000MW ultra-supercritical coal-fired unit will be constructed as well as the flue gas desulfurization and denitration device.

IV Construction conditions of the project

At present, the project has been approved by People’s Government of Heze under the operation of Preparation Office of Datang Yuncheng Power Generation Project. Index for total emission control of main pollutants has been approved by environmental protection agency of the city, and the index for coal decrement and replacement has been approved by economic information management committee of the city. The project is expected to start the construction in 2017.

V Total investment of the project

$ 1181.89 million

VI Market and economic benefit analysis and forecast

After the engineering is completed and put into operation, 4.43 million tons of coals will be consumed supposing that the number of annual utilization hours is 5500, the generating capacity is expected to be 110×108kWh, the transported electric power is expected to be 103×108kWh, the sales income can reach to 4.5 billion CNY, the profit and tax can reach to 1.54026 billion CNY, 300 employees will be newly increased, and about 550 local employees will be used.

VII Ways of cooperation

Joint venture, cooperation, sole proprietorship

VIII Contact information

Contact address: Commerce Bureau of Heze City

Contact person: Xu Hui

Post code: 274000

Contact number: 0086-530-6226266

E-mail: 5336400@163.com

【打印本页】【关闭窗口】
山东商务网版权与免责声明:

1、凡本站及其子站注明“文章类型:原创”的所有作品,其版权属于山东国际商务网及其子站所有。其他媒体、网站或个人转载使用时必须注明:“文章来源:山东国际商务网”。
2、凡本站及其子站注明“文章类型:转载”、“文章类型:编译”、“文章类型:摘编”的所有作品,均转载、编译或摘编自其它媒体,转载、编译或摘编的目的在于传递更多信息,并不代表本站及其子站赞同其观点和对其真实性负责。其他媒体、网站或个人转载使用时必须保留本站注明的文章来源,并自负法律责任。

Produced By 大汉网络 大汉版通发布系统